All Categories

News

Home >  News & Blog >  News

Precision in Practice: Our Engineering Team Completes Luxury Hotel Laundry System Installation Ahead of Schedule

Jun 17, 2025

When the five-star Radisson Hotel prepared to launch its 367-guestroom property in Q3 2025, our engineers faced a critical mission: installing and commissioning a 1000kg/hour industrial laundry system within a constrained 1-week timeline. Through meticulous laser-leveling of ironer rollers(precision: ≤0.2mm/m) and dynamic load testing of washer-extractors, we not only delivered flawless functionality but achieved 20% energy savings versus industry benchmarks.

加蓬洗衣房.png

The following are the key considerations for laundry equipment installation & debugging in 5-Star hotels

1. Industrial Washer-Extractor Installation

Foundation: Floor load ≥1000kg/m² with shock-absorbing bases; pipe alignment tolerance ≤5cm.  

Utilities: Steam pressure stabilized at 0.4-0.6MPa with reducers; drain pipes ≥150mm diameter.  

 

2. Zoning & Workflow Optimization  

Contamination Control: Negative-pressure ventilation between soiled/clean zones; airtight partitions.  

Logistics: Cart corridor width ≥3m; inline alignment of ironers & folders.  

 

3. Finishing Equipment Calibration

Ironer: Roller leveling by laser (≤0.2mm/m); variable speed for fabric types.  

Folder: Photoelectric sensor sensitivity adjusted to ensure ≤1cm folding deviation.

 

Debugging Protocol  

Phase

Critical Steps

参数标准

No-load

2hr low-speed run(30rpm);bearing temp/vibration

≤65℃;≤4.5mm/s

Load Test

Step loading(30%→60%→100%),verify moisture extraction

Residual Moisture≤30%

Sync Test

Ironer-folder speed synchronization

Misalignment Rate≤3%

 

Compliance and environmental protection requirements

Mandatory standards:

Structural safety: Emergency stop device and protective door lock in accordance with “Safety Standards for Laundry Machinery and Operations”

Emission control: Wastewater pH value (6.5-7.5), suspended solids (SS) ≤ 50mg/L, flocculation flotation + filtration system required

Fire protection regulations: Open flames are prohibited in dry cleaning areas, and automatic sprinklers + dust concentration alarms are equipped in fiber dust areas

Inquiry Inquiry Emil Emil Tel Tel Back to TopBack to Top

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000